Customer trust

Customer Testimonials

Real project outcomes delivered by DOWBUSH energo across industry, infrastructure, and energy.

DOWBUSH energo delivered without interrupting season-critical operations. We gained stability and cost control.

Problem: Frequent voltage drops during peak periods disrupted drying-line operations.

Result: After power-node modernization, forced shutdowns dropped by 62% and production planning became stable.

Oleksandr Kravets

Technical Director

AGROLINE GROUP LLC

Agro-processing

The solution balanced safety and operations. Every stage was transparent and well documented.

Problem: We needed a safe transformer upgrade for critical medical loads.

Result: Phased commissioning avoided interruption of key departments and grid incidents dropped to near zero.

Iryna Vlasenko

Head of Energy Service

VITA+ Medical Center

Healthcare

The biggest value was disciplined planning with no business downtime.

Problem: Our warehouse complex had unstable night-shift performance under high load.

Result: After network upgrade and protection tuning, emergency calls declined by 48%.

Dmytro Levchuk

Operations Manager

WestLog Terminal

Logistics

DOWBUSH energo handled both technical depth and launch execution. The result matched our specification.

Problem: We had to connect a new production line without overloading existing infrastructure.

Result: The site gained reserve capacity and stable network parameters for future expansion.

Nataliia Palamarchuk

Chief Engineer

GreenSteel Industries

Metallurgy

Strong coordination between engineers and installation teams helped us avoid costly delays.

Problem: We needed fast integration for a new PV phase with strict deadlines.

Result: The site was launched on schedule and commissioning-stage losses were minimized.

Maksym Hnatiuk

Project Manager

Solar East Development

Renewable energy

We received a complete engineering solution, not just installation work.

Problem: The existing pumping-station supply model failed under summer peak demand.

Result: After implementation, emergency outages were reduced by 55% and service stability improved.

Taras Melnyk

Deputy Director

South City Water Utility

Municipal infrastructure

Need a similar implementation?