Calculation mode
ESS/BESS Payback Calculator
The calculator covers all 4 solutions: ESS 30 (indoor and outdoor), ESS 50, and BESS 125, including VAT adjustment, peak demand, load shifting, generator costs, and downtime value.
B2B scenarios
Load profiles
All Solutions
Input Parameters
Results
Price incl. VAT
1,520,000 грн
Price excl. VAT
1,266,667 грн
Energy savings / month
43,642 грн
Avoided downtime / month
240,000 грн
Total savings / month
43,642 грн
Savings / year
523,704 грн
Payback
2.42 years
Monthly breakdown:
• Peak shaving: 18,000 грн
• TOU shifting (net): 22,842 грн
• Gross shift saving: 24,300 грн; degradation: 1,458 грн
• Generator: 2,800 грн
• Avoided downtime: 240,000 грн
Market Benchmarks 2025-2026
- - Transmission tariff (NPC Ukrenergo): 742.91 грн/МВт·год (Apr-Dec 2026)
- - Distribution (DSO, class 2) in 2026: 1 694.44 - 3 499.03 грн/МВт·год (depends on DSO)
- - DAM Base index (January 2026): 8 253.26 грн/МВт·год
- - DAM/IDM price caps: 5 600 - 15 000 грн/МВт·год (time-zone dependent)
- - Diesel (average retail benchmark): 58-60 грн/л (market reference)
Note: for many B2B contracts, capacity charge (UAH/kW/month) is contractual and site-specific. That is why this parameter remains user-adjustable.
Custom model
Need a precise model for your real load profile?
Share your load profile and tariff structure, and we will prepare a tailored techno-economic calculation.